New Year, Still Digging

What better way could there be to burn off the indolent excesses of Christmas and Hogmanay than head up the hill and help dig in the next leg of our network? Well, I can think of a few, but at least here we can go home with a warm glow of community participation, our innards warmed by Andrea’s excellent soup, even if our feet are freezing. Continue reading New Year, Still Digging

The First Cut is the Deepest…

…or it is when the first segment of the network has to run along an unmade track. But here’s the first demonstration that we’re finally turning years of effort and planning into reality: this, today, is the very first section of dig for the first network segment.

It’s slightly ahead of the rest of the project – our local property developer needed to surface the track to his plots so has kindly offered to dig in the ducting for us, to save us (and him) from having to dig up his newly surfaced road again in a few weeks’ time. 

But this is going to serve the first segment of network from the access point to the fibre backhaul at Stronvar, from where the network will be radiating out to the rest of the glen, just as soon as we can get ourselves and suppliers organised – that’s an ongoing job.

We’ve also got the final network design review happening next week, after which we should have everything nailed down, routes and equipment chosen. Then we’ll really be ready to get going.

B4RN Storming

As many will know by know, the pioneer project in self-assembly broadband isn’t Swedish, but from Lancashire, where the staff and volunteers of B4RN have now rolled out true fibre broadband, so far to 2600 properties, with the number growing by the day. Their service is truly future-proof, delivering 1Gb/s now, rising soon to 5Gb/s for those who want it. To put that into perspective, that’s 3x as fast on download and 17x as fast on upload as BT’s fibre-to-the-home (FTTH) service, even in the few areas where that is available. And it’s 12.5x as fast on download as BT’s so-called “Superfast Fibre” (which it isn’t). And, when there’s a demand for even more performance, all B4RN has to do is turn up the wick, not dig up the ground.

Continue reading B4RN Storming

R100

The original R100 was the most successful British airship of the 1930s, insofar as it never actually crashed and burned, unlike rather too many of its contemporaries. So let’s hope that’s a good omen, as the Scottish Government’s new broadband programme has been given the same name. In this case though, it stands for “Reach 100%”. By that, they mean provision of coverage of 100% of properties with “superfast” broadband by 2021.

Continue reading R100

Universal Service Exemption

I was asked to comment last night on Radio 4’s PM programme about the commitment in the Queen’s Speech to 10Mb/s broadband for all in the UK by 2020. The BBC only had a very limited time available, but I did manage to get ‘fatuous’ and ‘insane’ into my piece, which gives you some idea of where I’m coming from. The on-air piece itself is available here on iPlayer (starting 17:37 in).

Continue reading Universal Service Exemption

Two Steps Forward, One Step Back…

Yes, these are pictures of a nuclear bunker, this being the forthcoming Bogons data centre near Comrie. It is also where our fibre should meet that of the wider world and will, we hope, achieve  economies of scale from aggregation with other users that will make our network ever cheaper to run: if we just bought our backhaul (the link between the glen and the wider internet) at about the same initial cost from a commercial provider, we’d still have to pay Openreach’s Excess Construction Costs to get the link from the Strathyre Exchange to the entrance to the glen, but we’d never thereafter gain any benefit from others using the wider link. With the bunker, the idea is that we start at par and then go down in cost from there.

Continue reading Two Steps Forward, One Step Back…

February News…

Build Progress

We’ve had the cabling company that works with Bogons, our preferred supplier, out to look at the glen and they’ve now been commissioned to come back and carry out the necessary detailed survey (taking 4/5 days) to fully cost what’s needed. That’s happening from 8 March. We’ve asked them to provide us with a menu of costs for each part of the network: the 13km that gets to all bar 22 of the 178 properties in our area and for each segment beyond that (totalling another 13km). This will let us work out just how much of the work we need to do ourselves to get to all parts of the glen: we know that the only way we will be able to provide fibre to every house or business in the area will through significant community effort as part of the lay.

The rest of our costs are now fairly firm, so we’re awaiting the survey results that will let us know just where we stand. We’re including in that survey the costs of crossing both the glen road where needed and the A84 where we’re serving Balquhidder Station.

Continue reading February News…

Copper-Bottomed Con

Whilst we and other communities in the UK push ahead with bringing fibre to every property in our area, The UK and Local governments continue to give a good impression of being in thrall to the BT Group, an underachieving and disinterested private monopoly that still tries to pretend that copper-to-premises is a valid service model for the twenty-first century. Continue reading Copper-Bottomed Con

Moving Targets…

Like many other rural Scottish communities, our problem is geography: having a fairly small but highly dispersed population strung out along the loch sides and side glens. Our core funding from Community Broadband Scotland will cover the capital expenditure and setup for our external connection and at least the bulk of our costs for our backbone within the glen, which is great. However, connecting the outlying clusters of properties (most of them farms) might be pushing the limits of available funding.

Continue reading Moving Targets…